W24D4 – Pissed off and Absent – Update…

OK so the last week or so I have not been bothered to update the website as frankly I’ve not been in the mood for it.

Since the last post we have

  • Identified the problem with the shower. Awaiting B&Q.
  • Got another skip and filling it.
  • Emptied some of the loft in order for the electrician to complete his full rewire (£1-1.4k extra)
  • Finished off the bathroom worktop and sink (still not done the towel rail though)
  • knocked through to the dining room,
  • Plaster Boarded the kitchen
  • Plastered the kitchen ceiling
  • Plastered half the walls in the Dining room.
  • Put the stud walls into the kitchen for utility rooms.
  • Had the kitchen delivered – Still to audit this one.
  • Had the spindles put on top of the stairs
  • Added the Gallows to the front porch.
  • Decided to block up the living room / dining room entrance……..
  • Ripped up the flooring in the dining room.

Yesterday we lost the Sink and the Washing machine meaning that simply put we have no kitchen whatsoever.  Ahh well – at least we’re still smiling….

\ Get the latest news /

You May Have Missed

PAGE TOP