W30D1 – Catch up from the past two weeks..

I’ve missed a couple of weeks update as I have just not been in the right frame of mind as things started to spiral….

So to state story so far…

  • Electrics are complete.  The rewire and new work all completed – all lights sockets etc done.
  • Daniel’s room has been painted and looks absolutely amazing – good paint choice and the new light looks lovely.
  • Kitchen Walls and ceiling painted – second coat for walls today.
  • Ffion has a new light, same as Dans, but there is an issue – the remotes are not on separate channels and therefore operate both rooms – as we do not want all out light-war – Ffion will have to have another one.
  • The Flooring is complete downstairs and looks really good.  It’s not as cold as I expected.
  • Back is completed and looks the business.
  • Living room plastered – still a patch to do on the new wall to complete the room though..
  • Delivery of another skip – skip company damaged kerb stones.

So what’s left to complete ?

  • Breakfast bar
  • Sun Pipe in the Landing ceiling.
  • Painting
  • Doors upstairs
  • Plumbing toilet and fixing the shower door.
  • Front Steps – Drainage and front garden.

And there is the Final chuckle – Penis-Gate –  The Gas Pipe from the mains cupboard to the Boiler just looks wrong…. !!

 