W26D2 – Kitchen in almost… Virgin moved some cables…

The Kitchen has been put in – however, still cannot get the worktops in as we have been let down by our fitters and Workmen.  Looks like 2 weeks before we can get the surfaces in so need to take some time and have a chat with B&Q to see about returning the corian and getting some other worktops that my lads can fit.

The hallway was worked on and the study – needed to be done as Virgin was due to arrive to install the cable for Dans Room and the move of the modem.

Virgin came and delivered a brand new V6 box and put in 2 more cables.